CSG Exploration surface facilities, networks and evaporation ponds

CSG to LNG dramatically accelerated exploration, piloting and reserves upgrades, surface infrastructure was required for operational testing, characterising the reserves.

Scott provided project engineering and contract management services, delivering facilities for 18 exploration wells over multiple sites. The scope included gas and water pipelines, wellhead separation, power generation and lined evaporation ponds.

image

3ha evaporation pond lined nearing completion

image

4ha pond embankment material conditioning

image

4ha pond construction after topsoil strip